Craft & DIY kit fulfillment
When a maker opens the box, every piece needs to be there. Give Rapid an approved sample and a versioned build sheet so the warehouse can assemble the right project, count complete kits and flag shortages before release.

Define the SKU and quantity for every piece.
Keep the packing sequence and instruction version together.
Download an editable CSV with an embroidery kit example.
Build sheet for an embroidery kit
Use one row per component. Record the kit SKU, build version, component SKU, quantity per kit, usable stock, substitution rule and an approved sample photo reference. Copy the example rows for your own project, then have the brand approve the finished sample.
Download the editable kit build sheet (.csv)
Approve the kit a customer will actually open.
Lay out one finished project kit in packing order. Photograph the contents and the closed package, then sign off the build version. If a color or instruction changes, the warehouse needs a new approval and a clear point to switch versions.
500 planned kits, 480 instruction sheets. How many can ship?
| Component | Usable stock | Units per kit | Complete kits supported |
|---|---|---|---|
| Embroidery hoop | 500 | 1 | 500 |
| Green thread pack | 500 | 1 | 500 |
| Instruction sheet | 480 | 1 | 480 |
With one of each component per kit, the instruction sheets cap the build at 480. If the brand authorizes a partial release, build 480, hold the remaining components and identify the 20 orders awaiting replenishment. If the launch must ship together, hold the batch. A revised instruction sheet needs the brand’s approval before it enters the build.
Keep refills and finished kits separate
A refill may share thread with a starter kit but omit the hoop. Give the refill its own SKU and component list. Count rejected or damaged pieces separately from usable stock. For a subscription edition, record which build version belongs to each month before accepting renewals.
Questions buyers ask
How many kits can ship if one component is short?
Divide usable stock by the quantity required per kit for each component and round down. The smallest result is your upper limit before reservations or quality holds.
Can starter kits and refills draw from the same stock?
Yes, if the agreed inventory setup supports shared components. Give each sellable kit its own build sheet and reserve components for released work before promising refill quantities.
How should we handle a mid-run design change?
Create a new build version and record the first order or batch using it. Hold affected stock until the brand approves the new sample and the warehouse has the current instructions.
What to send for a quote
Plan my kit build- Component list, quantities per kit and current stock
- Sample photos, packing sequence and substitution rules
- Target build size, ship date and partial-release preference